For Better or Worse
For Richer or Poorer
Back To Home Page
2004 Cefn Croes wind farm, access road construction started.   Aim to transport 39 turbines, each 1.5 megawatt installed capacity.   327 feet (100 metres) overall height of most of the turbines.   Big Ben 316 feet (96 metres) height.
137 feet (42 metres) length of the 59 lorries
Cefn Croes 16-05-06
Before the project
After the project
Any thoughts or comments leave on Home Page or guest book please
        Personal view why not off shore out of everyones way